| 71 |
Costing of S.K Oil w.e.f 01.09.2022 |
|
Download (207.51 KB)
|
| 72 |
Costing of S.K Oil w.e.f 01.08.2022 |
|
Download (261.05 KB)
|
| 73 |
Standard Operating Procedure for different projects under Panchayat Samiti Boudh |
|
Download (1.37 MB)
|
| 74 |
Draft Rehabilitation and Resettlement Scheme for the displaced families of Bhaunripathar Villages for Khurdha-Balangir Railway project |
|
Download (2.37 MB)
|
| 75 |
Costing of S.K Oil w.e.f 01.07.2022 |
|
Download (213.28 KB)
|
| 76 |
Opening of WODC ECo Park tender (Nandan Van) on 08-07-2022 at DRDA Conference Hall,Boudh at 10.30 AM |
|
Download (235.19 KB)
|
| 77 |
Costing of S.K Oil w.e.f 01.06.2022 |
|
Download (202.33 KB)
|
| 78 |
RBSK Microplan 2022-23 for MHT Purunakatak |
|
Download (338.18 KB)
|
| 79 |
RBSK Microplan 2022-23 for MHT Adenigarh |
|
Download (347.5 KB)
|
| 80 |
RBSK Microplan 2022-23 for MHT Baunsuni |
|
Download (350.93 KB)
|